SAP ABAP Data Element CC_RVMAX (Indicator: Next Revision Level Must Be Higher)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Basic Data
Data Element | CC_RVMAX |
Short Description | Indicator: Next Revision Level Must Be Higher |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | HigherRvlv |
Medium | 15 | Higher Rev.Lev. |
Long | 20 | Higher Rev. Level |
Heading | 6 | Hr.Rev |
Documentation
Definition
This indicator controls revision level assignment for both internal and external assignment. The next revision level assigned from the defined sequence of revision levels must be higher than the previous revision level assigned.
Use
If you set this indicator, the system sorts the revision levels in alphanumerical order, irrespective of the predefined revision level sequence.
Procedure
Examples
Defined sequence of revision levels for a material:
Seq. Revision level
1 A
2 B
3 C
4 D
A material has revision level B assigned to it.
If you want to assign a new revision level, and this indicator:
- is set, you can assign either revision level C or D
- is not set, you can assign revision level A, C, or D
Dependencies
Do not set this indicator if you want to make extended sequence checks.
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in |