Hierarchy
⤷ LO-ECH (Application Component) Engineering Change Management
⤷ CC01 (Package) Engineering change management enhanced core
Basic Data
Data Element | CC_REVLV_EXT |
Short Description | Revision Level |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CC_REVLV | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rev. Level |
Medium | 15 | Revision Level |
Long | 20 | Revision Level |
Heading | 6 | RevLev |
Documentation
Definition
Identifies the change status of a material or document in addition to the change number.
Procedure
You can assign a revision level on a certain valid-from date when an object is changed with reference to a change number.
Proceed as follows:
- Changing a material
You can assign the revision level during processing in the material master record or in the header of the material BOM.
- Changing a document
You can control whether a revision level is assigned, depending on the document type. You define a document status, for which the release indicator is selected. When you process a document with this document type with reference to a change number and set this status for the first time, the system assigns the revision level automatically.
Dependencies
You have to define a revision level before you can assign it. To do this, in the SAP Easy Access Menu, choose Logistics -> Central Functions -> Engineering -> Engineering Change Management -> Revision Level -> Material Revision Level or Document Revision Level.
You specify how the revision level is assigned in the Set Control Data work step.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 604 |