Hierarchy
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Basic Data
Data Element | CC_REVLV |
Short Description | Revision Level |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CC_REVLV | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | RVS | |
Default Component name | REV_LEV | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rev. Level |
Medium | 15 | Revision Level |
Long | 20 | Revision Level |
Heading | 6 | RevLev |
Documentation
Definition
Indicates a material or document's change status in addition to the change number.
Procedure
You can assign a revision level when you make a change with reference to a change number with a particular valid-from date.
To do this, proceed as follows:
- Change a Material
You can assign a revision level directly during processing in the material master record or in the material BOM header.
- Change a Document
With documents, you can control whether a revision level is assigned, according to the document type. In this case you define a document status and set the release indicator for it. As soon as you process a document of this type, with reference to a change number and set this status for the first time, the revision level is assigned automatically.
Dependencies
To enable you to enter a revision level, you first have to define it. To do this choose Logistics -> Central functions -> Engineering change management and then the menu path Revision level -> Material rev. level or Document rev. level.
In the Setup control data section you can define how you want the assignment to be made.
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in |