SAP ABAP Data Element CC_NOWMS (Date Shift: Convert Warning Messages to Error Messages)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
⤷ CA-GTF-ECM (Application Component) Engineering Change Management
⤷ CC (Package) Engineering Change Management
Basic Data
Data Element | CC_NOWMS |
Short Description | Date Shift: Convert Warning Messages to Error Messages |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Error Only |
Medium | 15 | Errors Only |
Long | 20 | Error Messages Only |
Heading | 9 | ErrorOnly |
Documentation
Definition
This indicator controls the type of message you see if you carry out a date shift that changes the sequence of effectivity periods for BOMs and routing.
Use
It is possible to carry out a date shift that changes the sequence of effectivity periods for BOMs and routing.
Usually, you see a warning message for BOMs and routing in this situation.
However, if you do not want to date shifts to be allowed in this situation (as is the case for all other change object types), set this indicator. All the messages that you normally see as warning messages are converted to error messages. This prevents you from carrying out a date shift if this situation applies to BOMs and routing, too.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in |