SAP ABAP Data Element CC_EFPR (Priority for effectivity types)
Hierarchy
SAP_ABA (Software Component) Cross-Application Component
   CA-GTF-ECM (Application Component) Engineering Change Management
     CC (Package) Engineering Change Management
Basic Data
Data Element CC_EFPR
Short Description Priority for effectivity types  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC2    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Priority 
Medium 15 Priority 
Long 20 Priority 
Heading Priority 
Documentation

Definition

Priority of effectivity type for object changes.

Use

The system uses the priority to determine one effective change status if the following conditions apply (for example, for BOM explosion):

  1. An object (for example, BOM) has been changed several times with different change numbers.
  2. The change numbers have different effectivity types.
  3. if one release key has been maintained for change master records, more than one change master record is relased via the release key.

Procedure

Examples

You change a BOM with 2 change numbers.

  • One change number has effectivity type DATE (time period), the other has effectivity type SERNR (serial number).
  • Both change numbers are released.

Effectivity type        Priority    Change number

DATE        10    N-1

SERNR        20    N-2

Effectivity type SERNR has a higher priority, so the BOM explosion reads the changes made with this change number.

Dependencies

If you change an object several times with change number that have different change types, the system determines the change number that has the change type with the highest priority in the sequence you define.

History
Last changed by/on SAP  20020827 
SAP Release Created in