Hierarchy

⤷

⤷

Basic Data
Data Element | CC_DIRZU |
Short Description | Overriding |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CC_DIRZU | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Overriding |
Medium | 15 | Overriding |
Long | 26 | Only with Leading Chg Mst. |
Heading | 14 | Overriding |
Documentation
Definition
Indicates whether parameter value assignments and dates can be overridden by all change numbers or only with leading change master records
Use
When you set this indicator you can only override parameter value assignments with leading change master records.
Dependencies
This indicator is only relevant if you want to affect the result of a BOM explosion by making certain change numbers valid or invalid. The usual explosion logic is then overridden. You activate this function in the material master (View: Basic Data 1) using the indicator Assign Effectivity Values.
For more information, see the SAP Library under Logistics -> Logistics (General) -> Engineering Change Management -> Working with Parameter Effectivity -> Assignment of Effectivity Parameters -> Overriding Validity with Change Numbers.
History
Last changed by/on | SAP | 20020827 |
SAP Release Created in | 46C |