SAP ABAP Data Element CBP_PLINIFLG (Plan initialization flag)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ LO-SCI-POI (Application Component) Production Optimization Interface (POI)
⤷ CBP (Package) PP-CBP: Constraint-based Planning
⤷ LO-SCI-POI (Application Component) Production Optimization Interface (POI)
⤷ CBP (Package) PP-CBP: Constraint-based Planning
Basic Data
Data Element | CBP_PLINIFLG |
Short Description | Plan initialization flag |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ini flg |
Medium | 19 | Plan Initialization |
Long | 19 | Plan Initialization |
Heading | 19 | Plan Initialization |
Documentation
Definition
You can refresh the external plan before planning new objects by setting this flag in either the profile for external planning window, or in the settings for external planning window.
When this flag is set, the external system is instructed to erase every demand figure and every production figure in the current planning version, before it incorporates the new demands and starts the planning run.
This flag should typically only be set, where there is something wrong with the plan in the external planning system.
History
Last changed by/on | SAP | 19971012 |
SAP Release Created in |