SAP ABAP Data Element CB_LEIST (Activity backflush)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
⤷ PP-REM (Application Component) Repetitive Manufacturing
⤷ MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element | CB_LEIST |
Short Description | Activity backflush |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHECKBOX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Post act. |
Medium | 20 | Post activities |
Long | 40 | Post activities |
Heading | 55 | Post activities |
Documentation
Definition
Controls whether the system also posts activities to the product cost collector when backflushing.
Use
You have the option of posting activities on the basis of the following cost estimates:
- Preliminary costing for the product cost collector.
You can create this cost estimate per production version. This makes sense if you produce one material using different production versions and routings in one period.
- Standard cost estimate per material.
You can create this cost estimate once in a period with reference to a routing. You can post activities on the basis of this cost estimate if you produce a material using only one production version in one period.
History
Last changed by/on | SAP | 19990223 |
SAP Release Created in |