SAP ABAP Data Element CATS_PARSTORN (Number of Parallel Tasks (Max. 9) for Cancelation)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ CA-TS (Application Component) Time Sheet
⤷ CATS (Package) Cross-application time sheet
⤷ CA-TS (Application Component) Time Sheet
⤷ CATS (Package) Cross-application time sheet
Basic Data
Data Element | CATS_PARSTORN |
Short Description | Number of Parallel Tasks (Max. 9) for Cancelation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Par. canc. |
Medium | 15 | Parallel canc. |
Long | 20 | Parallel cancel. |
Heading | 16 | Parallel cancel. |
Documentation
Definition
Specifies how many parallel tasks run asynchronously.
Use
Number of parallel tasks for cancellation <= 1
The records to be canceled are processed sequentially in one task (corresponds to the standard procedure in the releases up to 4.6A).
Number of parallel tasks for cancellation > 1 (<= 9)
The records to be canceled are processed in parallel in a separate session. This improves system perfomance when processing large records, especially orders or networks with many confirmation documents. If there are only a few confirmation documents for each order, a number > 1 only marginally improves performance or does not improve it at all.
Note
If you have problems with system resources or the message "Maximum number of sessions reached" appears, reduce the number of tasks and run the transfer report again.
History
Last changed by/on | SAP | 19991110 |
SAP Release Created in |