SAP ABAP Data Element BURB_UPPLIMDIST (Upper Limit as Maximum Difference to the Minimum Revenue)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷ PSM-FM-BCS-BU (Application Component) Budgeting
⤷ FMBP_E (Package) New Budgeting: generic part
⤷ PSM-FM-BCS-BU (Application Component) Budgeting
⤷ FMBP_E (Package) New Budgeting: generic part
Basic Data
Data Element | BURB_UPPLIMDIST |
Short Description | Upper Limit as Maximum Difference to the Minimum Revenue |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max. Diff. |
Medium | 20 | Max. Diff. to Min.R. |
Long | 40 | Maximum Difference to Minimum Revenue |
Heading | 21 | Max. Diff. to Min.R. |
Documentation
Definition
With this amount you define the upper limit for revenues as the maximum difference to the lower limit (= minimum revenue).
Use
By entering a maximum difference, you can define the amount to increase the budget by an amount that corresponds to a percentage share of the current budget.
You define the minimum revenue for this as a percentage of the current budget and specify an absolute amount in order to define the difference between the minimum revenue and upper limit. The upper limit is implicitly calculated in this way.
Example
The current budget amounts to $1,000. As minimum revenue, you define 20% of the current budget and specify $500 as the maximum difference. These settings mean that revenues between $200 and $700 will increase the budget.
History
Last changed by/on | SAP | 20030326 |
SAP Release Created in | 200 |