SAP ABAP Data Element BUDG2 (Planned Compensation To)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷ BC-BMT-OM (Application Component) Organizational Management
⤷ SP00 (Package) Organization and Planning
⤷ BC-BMT-OM (Application Component) Organizational Management
⤷ SP00 (Package) Organization and Planning
Basic Data
Data Element | BUDG2 |
Short Description | Planned Compensation To |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CURR9 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 9 | |
Decimal Places | 2 | |
Output Length | 12 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | COMP_TO | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Pl.compo. |
Medium | 15 | Plan'd compo.to |
Long | 17 | Planned compo.to |
Heading | 21 | Planned comp.to |
Documentation
Definition
Maximum value of planned compensation.
The value must be equal to or greater than the minimum payment.
The maximum value is entered directly or read from table T510.
Supplementary Documentation - BUDG2 1005
Use
The to field is used in conjunction with the Amount field to identify a suitable range of pay for a position. The field contains a maximum monetary value.
The to field also works in conjunction with the Currency and Period fields, which are used to identify the currency and frequency of pay, respectively.
Procedure
In CREATE mode, use this field to identify the maximum amount of pay acceptable for the position you are working with. To do so:
- type in the appropriate amount
In CHANGE mode, enter a different amount by typing over the existing figure.
History
Last changed by/on | SAP | 20010130 |
SAP Release Created in |