SAP ABAP Data Element BUAVC_ABSVAR (Maximum Permissible Absolute Variance)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷ PSM-FM-BCS-AC (Application Component) Availability Control
⤷ FMAVC_E (Package) Active availability control: generic part
⤷ PSM-FM-BCS-AC (Application Component) Availability Control
⤷ FMAVC_E (Package) Active availability control: generic part
Basic Data
Data Element | BUAVC_ABSVAR |
Short Description | Maximum Permissible Absolute Variance |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Variance |
Medium | 20 | Absolute Variance |
Long | 30 | Absolute Variance |
Heading | 21 | Absolute Variance |
Documentation
Definition
If the difference between the budget consumption and the consumable budget exceeds the absolute variance at the level of a control object, availability control triggers the appropriate action as defined in the tolerance profile.
Example
If the consumable budget is $1,000 and an absolute variance of $200 is entered, the appropriate action is triggered as soon as the total of budget consumption exceeds $1,200.
History
Last changed by/on | SAP | 20030326 |
SAP Release Created in | 200 |