SAP ABAP Data Element BEZZT (PM Notification Reference Date/Time)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MSE (Application Component) Mobile Service
⤷
IWOC (Package) Application Development R/3 Work Order Cycle

⤷

⤷

Basic Data
Data Element | BEZZT |
Short Description | PM Notification Reference Date/Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BEZZT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | RefDt/Tm |
Medium | 15 | Ref.Date/Time |
Long | 20 | ReferenceDate/Time |
Heading | 3 | RDT |
Documentation
Definition
Use
Date and time proposed when you complete the PM notification
Supplementary Documentation - BEZZT 0001
Use
Procedure
If you want to complete the PM notification at a time other than the time proposed, overwrite the default entry with the desired values.
Examples
In the PM standard system the completion date proposed for malfunction proposed as the completion date for malfunction reports is the time at which the malfunction ends, for activity reports it is the time at which the report is made.
Dependencies
The reference time is defined centrally for each PM notification type.
The time at which the notification is completed is very important for the maintenance history, because this determines which location and account assignment data (ILOA) of the reference object is entered in the history.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |