SAP ABAP Data Element BESCHEIDTAG (Grace Days Between Notif.Creation Date and Notification Date)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-WA (Application Component) Waste Management
⤷
EEWA (Package) IS-U: Waste Management

⤷

⤷

Basic Data
Data Element | BESCHEIDTAG |
Short Description | Grace Days Between Notif.Creation Date and Notification Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BESCHEIDTAG | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Notif. Day |
Medium | 15 | Notif. Day |
Long | 20 | Notification Day |
Heading | 3 | ND |
Documentation
Definition
Interval between the creation of a bill in the system, and the charge notification date that is printed on the municipal charges notification. This interval arises, for example, through the delay between the creation of the bill, and the printing by an external printer.
Use
Used to calculate the charge notification date. The interval is maintained by the number of days.
Dependencies
You can calculate the following from the charge notification date:
- The period for submitting rejection (for objections to the municipal charge notification)
- The due date (for the payment of charges)
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 472 |