SAP ABAP Data Element BDERR (Recalculation date for PDC)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-PA (Application Component) Personnel Administration
     PBAS (Package) SAP HR Master Data Application Development
Basic Data
Data Element BDERR
Short Description Recalculation date for PDC  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PDC_RECALCULATION_DATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PDC recal. 
Medium 15 PDC recal. 
Long 20 PDC recalculation 
Heading 10 PDC recal. 
Documentation

Definition

This field specifies the date on which the next time evaluation run should start. When time evaluation is complete, the date is set to the first day for which the report has not yet been run.

Use

This field is used for the retroactive accounting recognition in Time Evaluation.

History
Last changed by/on SAP  20010612 
SAP Release Created in