SAP ABAP Data Element BCTERMINAT (Change display of start/end date)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷
BC-FES-GRA (Application Component) Graphic
⤷
SGRC (Package) ABAP Graphics Development: Network, Bar Chart

⤷

⤷

Basic Data
Data Element | BCTERMINAT |
Short Description | Change display of start/end date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BCTERMINAT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start/end |
Medium | 15 | Start/end date |
Long | 20 | Start/end date |
Heading | 0 |
Documentation
Definition
This specifies the representation of the date. It indicates whether the start or end date should be displayed with, or without, an auxiliary line when a graphic object is moved.
Note
If you are using this parameter for capacity leveling in the graphic planning board, possible selections are reduced to two options:
- without auxiliary line
- with auxiliary line
The reason is that the display of the start and end date is indirectly controlled by the planning perspective. For future planning the start date is displayed, whereas for retrospective planning the end date is displayed.
History
Last changed by/on | SAP | 19950209 |
SAP Release Created in |