SAP ABAP Data Element BANK_DTE_CD_SELECTION_PERIOD (Default for Selection Period)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF-TS-CD (Application Component) Change Document Display and Time Stamp Management
⤷ BANK_CHDOC_TOOL (Package) Change Document Tool IBS FS
⤷ CA-GTF-TS-CD (Application Component) Change Document Display and Time Stamp Management
⤷ BANK_CHDOC_TOOL (Package) Change Document Tool IBS FS
Basic Data
Data Element | BANK_DTE_CD_SELECTION_PERIOD |
Short Description | Default for Selection Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BANK_CD_SELECTION_PERIOD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sel.Period |
Medium | 15 | SelectionPeriod |
Long | 30 | Selection Period |
Heading | 3 | SP |
Documentation
Definition
This defines the default values for the Selection Start Date and Selection End Date for change documents on the selection screen of the corresponding application.
Use
The selection period restricts the time interval from which the change documents are displayed.
Dependencies
Depending on the default values chosen for the selection period, you can overwrite the time period in the application when the change documents are displayed:
- No Default: If this is set, the system sets the start of the selection to the calendar date and time of the last change document. The selection end date is not defaulted. However, you can overwrite the selection period in the application to suit your requirements.
- Minimum Maximum Value: If this is set, the system defaults the selection start date with the oldest change document and the selection end date with the most recent change document. In this way you can see immediately whether you can expect change documents in the required selection period. However, you can overwrite the selection period in the application to suit your requirements.
- Last Change Document: If this is set, the system sets the selection start date to the calendar date and time of the last change document. The selection end date is not defaulted. This means the system only displays the last change document. However, you can overwrite the selection period in the application to suit your requirements.
- Calendar Date of Last Change Document: If this is set, the system defaults the selection start date with the calendar date of the most recent change document. The system displays all change documents from changes made on this calendar date. However, you can overwrite the selection period in the application to suit your requirements.
- Default Selection Start Date: The system enters the selection start date in accordance with the entries in the Select Selection Period group frame. For all other selection options, the entries in this group frame are ignored.
Example
History
Last changed by/on | SAP | 20110908 |
SAP Release Created in | 10 |