SAP ABAP Data Element AWWTV_X (Comparison Value Type for Variance Calculation)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-OBJ (Application Component) Cost Object Controlling
⤷
KK0C (Package) Customizing for Cost Object Controlling
⤷
⤷
Basic Data
| Data Element | AWWTV_X |
| Short Description | Comparison Value Type for Variance Calculation |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Var.CmpVTp |
| Medium | 15 | Var.CmpValType |
| Long | 20 | Var.Comprsn val.type |
| Heading | 55 | Comparison value type for variance calculation |
Documentation
Definition
For the calculation of the total variance in Cost Object Controlling, this specifies that the target costs are calculated in the standard cost estimate of the material.
- For the calculation of the production variances, the target costs are calculated in the preliminary cost estimate of the production order or process order or product cost collector (planned costs).
- For the calculation of the planned variances, the target costs are calculated in the standard cost estimate of the material.
In Cost Center Accounting, variances are always calculated with reference to the planned costs of the cost center.
History
| Last changed by/on | SAP | 19931130 |
| SAP Release Created in |