SAP ABAP Data Element AWWTB_X (Reference Value Type for Variance Calculation)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-OBJ (Application Component) Cost Object Controlling
⤷
KK0C (Package) Customizing for Cost Object Controlling
⤷
⤷
Basic Data
| Data Element | AWWTB_X |
| Short Description | Reference Value Type for Variance Calculation |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | RefValType |
| Medium | 15 | Ref. value type |
| Long | 20 | Ref.val. type f.var. |
| Heading | 55 | Reference value type for variance calculation |
Documentation
Definition
For the calculation of the total variances in Cost Object Accounting, this specifies that the control costs are calculated by means of simultaneous costing of the order (actual costs).
- For the calculation of the production variances, the control costs are calculated by means of simultaneous costing of the order (actual costs).
- For the calculation of the planned variances, the control costs are calculated by means of preliminary costing of the order (planned costs).
In Cost Center Accounting, variances are always calculated with reference to the actual costs of the cost center.
History
| Last changed by/on | SAP | 19950401 |
| SAP Release Created in |