SAP ABAP Data Element AVERT_KK (Number of days in arrears for external program)
Hierarchy
FI-CA (Software Component) FI-CA
   FI-CA (Application Component) Contract Accounts Receivable and Payable
     FKKB (Package) Contract A/R & A/P: Central Objects
Basic Data
Data Element AVERT_KK
Short Description Number of days in arrears for external program  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM4    
Data Type NUMC   Character string with only digits 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 alt.daysar 
Medium 15 alt.days/arrear 
Long 20 altern.days/arrears 
Heading DA 
Documentation

Definition

You can use the alternative days in arrears, if the dunning level is determined by an external program.

Note for utility companies

When the dunning level is increased, the alternative days in arrears are created by billing.

Note for SAP Insurance

If more items are included for an existing collective dunning procedure, the system does not check them against the days in arrears for the first dunning level, but against the alternative days in arrears for the first dunning level.

The value for the alternative days in arrears must be smaller than the value for the days in arrears for the second dunning level.

Example

The following Customizing settings exist:

    Days in arrears    Alt. days in arrears

1. Dunning level    30 days    10 days

2. Dunning level    60 days    %

This produces the following dunning procedure:

One item, which has been due for 31 days, is dunned for a business partner/contract. A dunning procedure is opened and the item goes to dunning level 1. Dunning takes place again after one month (61 days). The item goes to dunning level 2.

Another item is due at this time, which has been due for 12 days. This also goes to dunning level 2, as the alternative days in arrears for the first dunning level are set to 10 (before SAP for Insurance Release 4.71 , the system checked whether this new item had been due for at least 30 days).

However, if Customizing contains errors and the value for the alternative days in arrears (1st dunning level) exceeds the level for the second dunning level, the second dunning level is not reached: If you specify 100 days for the alternative days in arrears, the second dunning level is not reached as the system only checks all items to see whether they are older than 100 days.

History
Last changed by/on SAP  20050224 
SAP Release Created in