SAP ABAP Data Element AUSW_PPRR (WCA List: Month of Last Wage Statement)
Hierarchy
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
   PY-DE-NT-NI (Application Component) Social Insurance
     P01S (Package) HR Germany: Social Insurance
Basic Data
Data Element AUSW_PPRR
Short Description WCA List: Month of Last Wage Statement  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type P01S_MONAT    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Last WS 
Medium 15 Last WS 
Long 20 Last Wage Statement 
Heading RA 
Documentation

Definition

In this parameter, you specify the payroll period after which you created the wage statement for the year before the evaluation.

For the current wage statement, retroactive accounting for the year before the period specified is taken into account. The wage statement then contains the differences between the current results (that is, results based on the 'current period') for the previous year and the results based on the period specified.

Example:
You have created the wage statement for 1999 after the January 2000 payroll run. You then enter '01' as the month of the last wage statement. The report then takes into account retroactive accounting for 1999 that took place after January 2000.

If you make no entries here, retroactive accounting from the evaluation year to the previous year is taken into account. The current payroll period for the wage statement of the previous year is December of the previous year in this case.

If you enter '12', the payroll period is also interpreted as 'December of the previous year'. This means that you cannot evaluate retroactive accounting differences for a wage statement first created in December of the subsequent year (or later).

History
Last changed by/on SAP  20010222 
SAP Release Created in 470