SAP ABAP Data Element ANZPU_AP (Number of points per purchase order item)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Basic Data
Data Element ANZPU_AP
Short Description Number of points per purchase order item  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG15    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 15    
Decimal Places 3    
Output Length 19    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name POINTS_PER_ITEM   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Points 
Medium 15 Points 
Long 20 Points 
Heading 13 Points 
Documentation

Definition

Number of points that the rebate granter ("condition granter") awards for the purchase of this material.

Procedure

Enter the number of points that the vendor awards for purchases of the material.

Use

If you work with a points system instead of business volume figures (quantities or values) for the purposes of subsequent settlement (end-of-period rebate) accounting, the amount of the rebate payable is calculated on the basis of the total points awarded by the vendor for the materials purchased over the relevant period.

A points system allows you to weight a vendor's materials independently of their price.

Example:

Vendor ACME Corp. charges $100 per ton for the material Steel 1 and $5 per ton for the material Steel 2. This vendor grants a volume-based rebate amounting to 3% of your total business volume with him at the end of the year provided that you have accumulated at least 100,000 points for purchases of the relevant materials during this period. 25 points are awarded for every ton of the material Steel 1 you order, and 1 point for every ton of Steel 2.
When ordering, you can take into account how many tons of Steel 1 or Steel 2 you need to purchase in order to be awarded 100,000 points by the end of the year and qualify for the end-of-period rebate.

History
Last changed by/on SAP  19990312 
SAP Release Created in