Hierarchy
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | ADDWORK |
Short Description | ID: Employee can also cover this requirement |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PROPERTY | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ID |
Medium | 15 | ID |
Long | 20 | ID |
Heading | 2 | ID |
Documentation
Definition
A requirements record defined with an ID (identifier) can also be transferred from employees that are already assigned to a requirements record.
Use
Use the ID for requirements records that you also want to assign to a person in shift planning.
Procedure
To define a requirements record with an ID, activate the entry ID field.
Examples
In order to cover requirements, certain rotating tasks such as telephone consulting need to be completed. Because an employee needs to add this activity to his or own, you must identify the applicable requirements record by activating the ID field. This requirements record can also be assigned to a person who is already included in the shift plan.
Supplementary Documentation - ADDWORKTXT5100
Use
Use this ID for the requirements records you want to assign to a person in the shift plan.
Procedure
To indicate a requirements record with this ID, activate the ID field.
Examples
To cover a requirement, certain alternating tasks, such as telephone consulting, have to be completed. Because an employee has to do this task in additional to his or her usual takes, you indicate the corresponding requirements record by selecting the ID column.
This requirements record can also be assigned to a person already scheduled in the shift plan.
History
Last changed by/on | SAP | 20040114 |
SAP Release Created in |