Hierarchy
⤷ IS-U-DM-MR (Application Component) Meter Reading
⤷ EE17 (Package) IS-U: Meter Reading Data Entry
Basic Data
Data Element | ADATSOLL_UPL |
Short Description | Planned Meter Reading Date (for Upload) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | PLANDAT | |
Default Component name | TARGETMRDATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlndMRDate |
Medium | 15 | Planned MR Date |
Long | 20 | Planned MR Date |
Heading | 10 | PlndMRDate |
Documentation
Definition
Use
You can enter the planned meter reading date (TARGETMRDATE) as well as the meter reading date (MRDATEFORBILLING) for the upload of meter reading results.
The planned meter reading date is only relevant if an interim meter reading is in question. If this is the case, the system checks whether a meter reading order already exists for the planned reading date. If no meter reading order yet exists, the system creates one for this meter reading date.
If the planned meter reading date is not transferred, the interval that you entered is used to check whether meter reading orders or schedule records exist. You entered the interval in Customizing for SAP Utilities under Device Management -> Meter Reading -> Basic Settings -> Define Control Parameters for Meter Reading Data Processing in the Upload Interval (MROC interval for upload of periodic results) field.
Dependencies
Example
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 464 |