SAP ABAP Data Element ABKOM (REM-PT: MRP segment aggregation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   PP-REM (Application Component) Repetitive Manufacturing
     MD04 (Package) Repetitive Manufacturing
Basic Data
Data Element ABKOM
Short Description REM-PT: MRP segment aggregation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type ABKOM    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MRP seg. 
Medium 15 MRP segments 
Long 20 MRP segments 
Heading MS 
Documentation

Definition

This indicator defines that the MRP segments should be displayed in disaggregated form.

Use

If you choose the aggregated display, the System displays the production quantities of the individual customer or project segments as well as all the other segments in cumulated form. The requirements are cumulated, the available quantity is based on the net requirements segment. For make-to-order production, this means that the system cumulates the requirements, available quantities and so on of all individual customer segments.

With make-to-order production with SD scheduling agreements or when planning production lots (seiban), information on the individual segments should also be displayed individually in order to, for example, make entries with reference to the scheduling agreement (customer) or to a production lot.

Using the disaggregated display in the planning table, you can see the availability, production, requirements and range of coverage rows per individual segment.

If you use the aggregated display, the MRP segments are cumulated.

Dependencies

You define the type of display you want (aggregated or disaggregated) in Customizing for Repetitive Manufacturing, however, you can change it in the initial screen of the planning table.

History
Last changed by/on SAP  19980319 
SAP Release Created in