SAP ABAP Data Element /VSO/M_ANZ_PER_GVH (Number of Materials for each Closed PKM (VSO))
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
LE-DSD-VSO-MP (Application Component) Main Process
⤷
/VSO/M (Package) Vehicle Space Optimization: Main Process
⤷
⤷
Basic Data
| Data Element | /VSO/M_ANZ_PER_GVH |
| Short Description | Number of Materials for each Closed PKM (VSO) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /VSO/M_ANZ_PER_GVH | |
| Data Type | NUMC | Character string with only digits |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Mat / PKM |
| Medium | 15 | No. Mat / PKM |
| Long | 20 | No. Mat / Closed PKM |
| Heading | 7 | Mat/PKM |
Documentation
Definition
The value indicated here determines the maximum amount of materials a closed packaging material can hold.
Use
Dependencies
To enable packing materials in a closed packaging material in vehicle space optimization the following prerequisites must be fulfilled:
- The indicator 'closed' must be set on the screen 'Sales: General/Plant Data' for the packaging material in the material master.
- The indicator 'closed PKM required' must be set on the screen 'VSO Data' in the material master for the materials that shall be packed in a closed packaging material.
Example
History
| Last changed by/on | SAP | 20030430 |
| SAP Release Created in | 461 |