SAP ABAP Data Element /TDAG/CPE_FLG_CHKWRN_OK (Accept Incomplete Data for Check Result)
Hierarchy
☛
TDAGBCA (Software Component) TechniData Basic Components
⤷ EHS (Application Component) Environment, Health and Safety
⤷ /TDAG/CP (Package) Compliance for products
⤷ EHS (Application Component) Environment, Health and Safety
⤷ /TDAG/CP (Package) Compliance for products
Basic Data
Data Element | /TDAG/CPE_FLG_CHKWRN_OK |
Short Description | Accept Incomplete Data for Check Result |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /TDAG/CPD_FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Accept Wrn |
Medium | 20 | Accept Warning |
Long | 40 | Accept Warning Message |
Heading | 5 | Warn. |
Documentation
Definition
Indicates if the system is to accept a check result from the compliance check that indicates that data is incomplete (yellow light) at the time of export.
Use
You can use this setting for exporting and reporting files, such as IPC 1752x, XML, and IMDS.
Dependencies
Example
For IPC 1752x reporting / export the following settings are recommended
Check Accept Warning Accept Error
BASE X
ROHS X
JIG X
the system executes the following activities when a specification is exported:
- The system checks, whether the compliance check BASE has been executed successfully (green LED) or with warnings (yellow light) for the specification and whether the creation date of the report is more recent than the change date of the check result. If this is not the case the system creates corresponding error messages so that the export is not possible.
- The system checks, whether the compliance check ROHS and JIG have been executed for the specification and whether the result are either "checked suceessfully" (green led) or "checked with error" (red light). Additionally the system checks whether the creation date of the report is more recent than the change date of the check result. If this is not the case the system creates corresponding error messages so that the export is not possible.
If none of the settings have been specified for the export type (interface category), the system does not execute the above checks at the time of export.
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 0207B0406C |