SAP ABAP Data Element /SPE/OUTB_NO_GEOROUTE_CALC (Calculation of New Georoute Not Allowed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
LO-SPM-OUT (Application Component) Goods Issue Process
⤷
/SPE/VL (Package) WS-SHP: Shipping / Service Parts Managements enhancements
⤷
⤷
Basic Data
| Data Element | /SPE/OUTB_NO_GEOROUTE_CALC |
| Short Description | Calculation of New Georoute Not Allowed |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | NoCalcRte |
| Medium | 18 | No Route Calc. |
| Long | 28 | No Calc of New Georoute |
| Heading | 17 | No Calc of Route |
Documentation
Definition
If you are using the routing guide, you can decide in the delivery creation process whether you want to allow the system to calculate a new geographical route for items with a geographical route that was calculated in the order or the stock transport order, or whether you want to keep this geographical route.
Note: If this indicator is set, the geographical route is neither determined nor redetermined, even if the geographical route was blank.
Manually assigned geographical routes are never overridden by the system.
History
| Last changed by/on | SAP | 20100310 |
| SAP Release Created in | 100 |