SAP ABAP Data Element /SPE/OUTB_NO_GEOROUTE_CALC (Calculation of New Georoute Not Allowed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ LO-SPM-OUT (Application Component) Goods Issue Process
⤷ /SPE/VL (Package) WS-SHP: Shipping / Service Parts Managements enhancements
⤷ LO-SPM-OUT (Application Component) Goods Issue Process
⤷ /SPE/VL (Package) WS-SHP: Shipping / Service Parts Managements enhancements
Basic Data
Data Element | /SPE/OUTB_NO_GEOROUTE_CALC |
Short Description | Calculation of New Georoute Not Allowed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | NoCalcRte |
Medium | 18 | No Route Calc. |
Long | 28 | No Calc of New Georoute |
Heading | 17 | No Calc of Route |
Documentation
Definition
If you are using the routing guide, you can decide in the delivery creation process whether you want to allow the system to calculate a new geographical route for items with a geographical route that was calculated in the order or the stock transport order, or whether you want to keep this geographical route.
Note: If this indicator is set, the geographical route is neither determined nor redetermined, even if the geographical route was blank.
Manually assigned geographical routes are never overridden by the system.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 100 |