SAP ABAP Data Element /SAPPCE/DPNV_ORDER (Cost element is permitted for the order)
Hierarchy
EA-FIN (Software Component) EA-FIN
   PS-REV-CPR (Application Component) Construction Progress Report
     /SAPPCE/PNV (Package) Construction Progress Report and Valuation
Basic Data
Data Element /SAPPCE/DPNV_ORDER
Short Description Cost element is permitted for the order  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Order 
Medium 15 Order 
Long 20 Order 
Heading Order 
Documentation

Definition

Shows if the cost element for posting the contract values can be used.

Use

If you also use the cost element that you use for posting work values to post contract values, highlight the indicator.

If the cost element is only valid for entering work values and not the contract values, do not highlight the indicator.

Dependencies

Example

You have defined the following cost elements to which you wnat to assign work values:

510101     Main order

510111     Hourly wage

351101     Accumulated depreciation

You want to enter contract values for the first two cost elements. Therefore you indicate this as valid for the contract/order.

Cost element Accumulated Depreciation enables you to enter corrections for values for work completed which for example are necessary because of a reduction for an invioce. For this cost element you do not want to enter contract values, because it concerns only correction postings and not actual work completed.

History
Last changed by/on SAP  20030326 
SAP Release Created in 1.0