SAP ABAP Data Element /SAPPCE/DPCPPROZ (Percentage for Contractual Penalty)
Hierarchy
☛
EA-FIN (Software Component) EA-FIN
⤷ FI-AF-DPC (Application Component) Down Payment Chains
⤷ /SAPPCE/DPC (Package) Down Payment Chains
⤷ FI-AF-DPC (Application Component) Down Payment Chains
⤷ /SAPPCE/DPC (Package) Down Payment Chains
Basic Data
Data Element | /SAPPCE/DPCPPROZ |
Short Description | Percentage for Contractual Penalty |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC2_2 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 4 | |
Decimal Places | 2 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Percentage |
Medium | 15 | Percentage |
Long | 20 | Percentage |
Heading | 7 | Percent |
Documentation
Definition
Use
You can determine the contractually defined percentage for the contractual penalty.
The contractual penalty is calculated for each reference period from the percentage of the work that should have been completed by that point.
Dependencies
Example
The contractual penalties for delay per calendar day (in excess of interim and completion dates) is 0.25% of the work that should have been completed up to that point. In this example the percentage is 0.25.
History
Last changed by/on | SAP | 20030326 |
SAP Release Created in | 470 |