SAP ABAP Data Element /SAPPCE/DPCPPER (Period)
Hierarchy
EA-FIN (Software Component) EA-FIN
   FI-AF-DPC (Application Component) Down Payment Chains
     /SAPPCE/DPC (Package) Down Payment Chains
Basic Data
Data Element /SAPPCE/DPCPPER
Short Description Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC4    
Data Type DEC   Counter or amount field with comma and sign 
Length 4    
Decimal Places 0    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Period 
Medium 15 Period 
Long 20 Period 
Heading 14 Period 
Documentation

Definition

Use

When interim and completion dates overrun, the excess subject to contractual penalty is calculated in units of the reference period.

The contractual penalty is calculated for each reference period from the percentage rate of the work that should have been completed by that point.

Dependencies

Example

The contractual penalty for delay per calendar day (in excess of interim and completion date) is 0.25% of the work that should have been completed by the stipulated period. In this example, the reference period is one day.

History
Last changed by/on SAP  20030326 
SAP Release Created in 470