SAP ABAP Data Element /MRSS/T_CSG_INT_ASG_CMPLT_STAT (Status for Completion)
Hierarchy
☛
MRSS_NW (Software Component) SAP Multiresource Scheduling for SAP Net
⤷ CA (Application Component) Cross-Application Components
⤷ /MRSS/CSG (Package) CRM Integration
⤷ CA (Application Component) Cross-Application Components
⤷ /MRSS/CSG (Package) CRM Integration
Basic Data
Data Element | /MRSS/T_CSG_INT_ASG_CMPLT_STAT |
Short Description | Status for Completion |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | /MRSS/_STATUS_TYPE | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table | /MRSS/C_ABSTAT |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Completion |
Medium | 16 | Complet. Status |
Long | 38 | Status for Completion |
Heading | 44 | Status for Completion |
Documentation
Definition
Indicates the status that is set for an assignment in SAP Multiresource Scheduling once a confirmation is created for the related service order in SAP CRM.
Use
Enter the abstract status for completion in this field. The system sets this status for an assignment if the corresponding service order is confirmed in the SAP CRM system. An assignment with this status can no longer be changed in the SAP Multiresource Scheduling planning board.
Dependencies
- To activate the transfer of assignment status information from SAP CRM to SAP Multiresource Scheduling, you must select the Status Integration checkbox.
- In SAP CRM, status DPFI is set for service assignments once a confirmation is created for the related service order. In SAP Multiresource Scheduling, this status must be mapped to the abstract status you enter here.
You set up status mapping in Customizing for SAP Multiresource Scheduling under Basic Settings --> Assign Objects --> Status --> Assign Status (to Use Demand from SAP NetWeaver).
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 900 |