SAP ABAP Data Element /ISIDEX/E_SETTLUSAGE_DATE_FROM (Planned Reference Date (From))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-IDX (Application Component) Enhanced Intercompany Data Exchange
⤷
/ISIDEX/EE_EDM_SET (Package) IDEX Settlement

⤷

⤷

Basic Data
Data Element | /ISIDEX/E_SETTLUSAGE_DATE_FROM |
Short Description | Planned Reference Date (From) |
Data Type
Category of Dictionary Type | Direct Type Entry | |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ||
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd.Dt.Fr |
Medium | 15 | Plnd Date (Fr.) |
Long | 20 | Plnd Ref.Date (From) |
Heading | 21 | Plnd Ref.Date (From) |
Documentation
Definition
Start of settlement period (period), for which the point of delivery, with the corresponding usage factor was considered for the respective suppliers and customer groups when determining the overtake/undertake amount.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20050409 |
SAP Release Created in | 464 |