SAP ABAP Data Element /ISDFPS/RETENTION_DAYS (Number of Days for Displaying Completed PReq)
Hierarchy
EA-DFPS (Software Component) SAP Enterprise Extension Defense Forces & Public Security
   IS-DFS-OF-FDP (Application Component) Structures Workbench
     /ISDFPS/FDP (Package) Armed Forces and Deployment Planning
Basic Data
Data Element /ISDFPS/RETENTION_DAYS
Short Description Number of Days for Displaying Completed PReq  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC3    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Days 
Medium 15 Days Cmpl. PReq 
Long 20 Days Displ. CmplPReq 
Heading 10 Days Cmpl. 
Documentation

Definition

Specifies the number of days for which completed purchase requisitions (PReqs) are displayed in the Material Categories Planning application.

Use

The completed PReqs are still displayed so that the status code remains visible. When the requester has seen the status code, the PReq can be deleted.

The default value that you enter here is the period after which the PReq should no longer be displayed.

Dependencies

Example

History
Last changed by/on SAP  20050409 
SAP Release Created in 470