SAP ABAP Data Element /BEV3/CHOBJLBPR (Object Performance Participation Percentage)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
SD-SLS-PLL-OBS (Application Component) Remaining Beverage - Obsolete Objects
⤷
/BEV3/CH (Package) Contract Handling
⤷
⤷
Basic Data
| Data Element | /BEV3/CHOBJLBPR |
| Short Description | Object Performance Participation Percentage |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | /BEV3/CHOBJLBPR | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 5 | |
| Decimal Places | 2 | |
| Output Length | 6 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PartPercnt |
| Medium | 17 | Percent/Partic. |
| Long | 23 | Percent/participation |
| Heading | 10 | PartPercnt |
Documentation
Definition
If the participation is entered in percent, the system automatically calculates the absolute value and vice versa.
If both fields have been filled incorrectly and the entries have been confirmed, the absolute value has priority. It is useful to delete the entry in order to enable its calculation by the system.
If the absolute value of the participation exceeds the total value of the performance, a correction of the participation value is requested. Multiple entries are possible.
Percentage rate of a participation in an investment (3 digits, two decimal places).
Example: 30.00 %
History
| Last changed by/on | SAP | 20040116 |
| SAP Release Created in |