SAP ABAP IMG Activity SIMG_PP3ORKKOPN2 (Check Valuation Variants for Product Cost Collectors)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_PP3ORKKOPN2 Check Valuation Variants for Product Cost Collectors  
Transaction Code S_ALR_87008267   IMG Activity: SIMG_PP3ORKKOPN2 
Created on 19981222    
Customizing Attributes SIMG_PP3ORKKOPN2   Check Valuation Variants for Product Cost Collectors 
Customizing Activity SIMG_PP3ORKKOPN2   Check Valuation Variants for Product Cost Collectors 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_PP3ORKKOPN2    

In this step you check the valuation variants for Product Cost by Period.

  • The valuation variant for the preliminary costing of the product cost collector is used to determine the following:
    • Which price is used to valuate materials, external activites and subcontracting and which activity price is used to valuate activity types and business processes
    • Which costing sheet is used for preliminary costing
  • The valuation variant for simultaneous costing is used to determine the following:
    • What activity price is used to valuate the actual activity type and business process postings
    • Which costing sheet in the product cost collector is defaulted
    • This costing sheet is used for overhead calculation in period-end closing.

Strategies for material valuation or price determination for external processing and subcontracting are not included in simultaneous costing and final costing.

To be able to use the valuation variant, you must assign it to a costing variant.

Standard Settings

  • The standard system contains a number of predefined valuation variants. If necessary, you can change these valuation variants to meet your requirements by changing the standard strategy sequences.

The following default valuation variants exist in the standard costing variants for Product Cost by Period:

  • 001 - Plan Valuation Material

    This valuation variant for the preliminary costing of the product cost collector is specified in the SAP standard costing variant PREM (Preliminary Costing, Cost Collectors).

  • 007 - Production Order, Actual

    This valuation variant for the simultaneous costing of product cost collectors is specified in the SAP standard costing variant PPP3.

Actions

  1. Enter an alphanumeric key and a name for the new valuation variant.
  2. Specify the relevant valuation strategies.
  3. Enter a costing sheet.
  4. Assign the valuation variant to a costing variant.

Note

If you want to use different valuation strategies or different overhead rates in plants that belong to the same company code, you can define plant-specific valuation variants by assigning a valuation variant to a plant. Choose the push button Valuation variant/plant. If you don't do this, the valuation variants apply to all your plants.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_PP3ORKKOPN2 0 HLA0009425 Product Cost by Period 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_CK05 V - View OPN2 0000000018 Valuation Variants 
History
Last changed by/on SAP  19981222 
SAP Release Created in