Hierarchy
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
IMG Activity
ID | SIMG_PBS_PTSP_007 | Activate Assignment of Shift Abbreviation |
Transaction Code | S_PL0_09000194 | (empty) |
Created on | 20020405 | |
Customizing Attributes | SIMG_PBS_PTSP_007 | Activate Assignment of Shift Abbreviation |
Customizing Activity | SIMG_PBS_PTSP_007 | Activate Assignment of Shift Abbreviation |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_PBS_PTSP_007 |
Use
In Shift Planning, the shift abbreviation is not normally stored on the database. It can be determined using the start and end time and, if required, the daily work schedule.
If, however, a user changes the start or end time of a shift manually, the system may be unable to determine the abbreviation.
This activity controls whether the system determines the most suitable abbreviation when a clock time is changed or retains the original abbreviation and instead displays the changes by using a special display format for the abbreviation (such as in color, underlined, in italics).
Requirements
If you want to retain the shift abbreviation when times are changed, you must not use the parameter for time substitutions in the plan. The switch in table T77S0, group PEINS, semantic abbreviation TIM_V must be deactivated (= field must be blank).
Standard settings
By default the system determines a suitable new abbreviation when times are changed.
The functionality Retain shift abbreviation is currently only used for shift abbreviations, not for availability for work or other shifts.
Activities
- If you want to retain the original abbreviation, enter an X.
In the activity Specify shift groups you specify how to display the abbreviation of a modified shift (such as in color, underlined, in italics). - If you want the system to determine a suitable new abbreviation when times are changed, leave the field blank.
Business Attributes
ASAP Roadmap ID | 262 | Technical and Graphical Settings |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_PBS_PTSP_007 | 0 | HLA0009713 | Shift Planning |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_T77S0 | V - View | OO_PTSPPS_AKSP |
History
Last changed by/on | SAP | 20040227 |
SAP Release Created in | 470 |