SAP ABAP IMG Activity SIMG_PBS_PTSP_005 (Activate Immediate Evaluation of Time Information)
Hierarchy
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
   PT-SP-PS (Application Component) Shift Planning for Public Sector
     PP08_PS_DE (Package) Shift Planning (Germany)
IMG Activity
ID SIMG_PBS_PTSP_005 Activate Immediate Evaluation of Time Information  
Transaction Code S_PL0_09000126   (empty) 
Created on 20020325    
Customizing Attributes SIMG_PBS_PTSP_005   Activate Immediate Evaluation of Time Information 
Customizing Activity SIMG_PBS_PTSP_005   Activate Immediate Evaluation of Time Information 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_PBS_PTSP_005    

Use

The values of the time wage types are updated in the information columns after RPTIME00 has run.

If you activate the ad-hoc update, the information columns are updated immediately after you enter or change a shift.

This applies to all changes on the planning overview or on the detailed popup. Other entries that cause time information to be changed, such as switch of shifts, do not cause the info columns to be updated.

Note that the ad-hoc update is a simplified calculation of working hours, it can therefore lead to differences with the results from RPTIME00.

The ad-hoc update provides you with a new information line that you can show on activating this functionality. For morer information, see the Shift Planning IMG: Additional Lines in the Shift Plan (Public Sector Germany) ->
Activate Hourly Balance Line.

Requirements

Note that you should have simulated time evaluation (RPTIME00) once before you use the ad-hoc update in the application, because the system requires up-to-date output data for the ad-hoc update.

Standard settings

Activities

Three X characters are allowed for the entry. The first switches on the function for the target plan, the second for the actual plan and the third for the employee preferences. If, for example, you want to activate the update for all three areas, enter the value XXX.

To activate the hour balance line, you enter X at least in second place.

Define the information columns for which you want use the immediate valuation in the Select Information Columns and Define Standard Valuation activity.

Example

Business Attributes
ASAP Roadmap ID 262   Technical and Graphical Settings 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency I   Valid for countries specified 
Customizing Attributes Country Key Country Name
SIMG_PBS_PTSP_005 DE Germany
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_PBS_PTSP_005 0 L6B0000011 Shift Planning for Public Sector 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T77S0 V - View OO_PTSPPS_INCLUPD  
History
Last changed by/on SAP  20030106 
SAP Release Created in 470