Hierarchy
⤷ PT-SP-PS (Application Component) Shift Planning for Public Sector
⤷ PP08_PS_DE (Package) Shift Planning (Germany)
IMG Activity
ID | SIMG_PBS_PTSP_005 | Activate Immediate Evaluation of Time Information |
Transaction Code | S_PL0_09000126 | (empty) |
Created on | 20020325 | |
Customizing Attributes | SIMG_PBS_PTSP_005 | Activate Immediate Evaluation of Time Information |
Customizing Activity | SIMG_PBS_PTSP_005 | Activate Immediate Evaluation of Time Information |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_PBS_PTSP_005 |
Use
The values of the time wage types are updated in the information columns after RPTIME00 has run.
If you activate the ad-hoc update, the information columns are updated immediately after you enter or change a shift.
This applies to all changes on the planning overview or on the detailed popup. Other entries that cause time information to be changed, such as switch of shifts, do not cause the info columns to be updated.
Note that the ad-hoc update is a simplified calculation of working hours, it can therefore lead to differences with the results from RPTIME00.
The ad-hoc update provides you with a new information line that you can show on activating this functionality. For morer information, see the Shift Planning IMG: Additional Lines in the Shift Plan (Public Sector Germany) ->
Activate Hourly Balance Line.
Requirements
Note that you should have simulated time evaluation (RPTIME00) once before you use the ad-hoc update in the application, because the system requires up-to-date output data for the ad-hoc update.
Standard settings
Activities
Three X characters are allowed for the entry. The first switches on the function for the target plan, the second for the actual plan and the third for the employee preferences. If, for example, you want to activate the update for all three areas, enter the value XXX.
To activate the hour balance line, you enter X at least in second place.
Define the information columns for which you want use the immediate valuation in the Select Information Columns and Define Standard Valuation activity.
Example
Business Attributes
ASAP Roadmap ID | 262 | Technical and Graphical Settings |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | I | Valid for countries specified |
Customizing Attributes | Country Key | Country Name |
---|---|---|
SIMG_PBS_PTSP_005 | DE | Germany |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_PBS_PTSP_005 | 0 | L6B0000011 | Shift Planning for Public Sector |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_T77S0 | V - View | OO_PTSPPS_INCLUPD |
History
Last changed by/on | SAP | 20030106 |
SAP Release Created in | 470 |