SAP ABAP IMG Activity SIMG_ORKKOKKM (Define Transfer Control)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_ORKKOKKM Define Transfer Control  
Transaction Code S_ALR_87008161   IMG Activity: SIMG_ORKKOKKM 
Created on 19981222    
Customizing Attributes SIMG_ORKKOKKM   Define Transfer Strategy 
Customizing Activity SIMG_ORKKOKKM   Define Transfer Strategy 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUORKKOKKM    

In this step you define parameters for partial costing. The purpose of partial costing is to prevent the system from creating a new cost estimate for a material when costing data already exists. Instead, the existing costing data is simply transferred into the new cost estimate. This improves performance.

Partial Costing

Partial costing is particularly useful in the following situations:

  • You want to cost a new product. The BOM for this product contains materials that have already been costed, and you do not want to cost these materials again.
  • You want to cost all new products during the fiscal year. You define a costing run that includes all materials, and use transfer control so that only new products are selected.
  • You want to plan the costs for a sales order in product costing.
    • Some materials are carried in the sales order stock. These materials are produced or ordered for the sales order. You want to recost these materials.
    • Other materials are carried as collective requirements. These materials are withdrawn from stock and the costs are taken from the current standard cost estimate.
  • In the special procurement type you specified that cross-plant transfer is to take place. In the other plant, the quantity structure is not determined and is not costed.

The costing variant specifies a tranfer control that establishes the strategy sequence for the search for costing data:

  • Single-Plant Transfer

    If cost estimates for certain materials already exist in the individual levels of the BOM, they are not recosted. Rather, the existing costing data is transferred into the cost estimate in accordance with the transfer control.

    If you always want to recost, choose the transfer control No transfer.

  • Cross-Plant Transfer

    The following special procurement types are taken into account for transfer into material cost estimates:

    • Transfer from other plant
    • Production in other plant

      If you have entered one of these special procurement types in the costing view of the material master record, the system proceeds as follows:

    • In the plant from which the material component is withdrawn according to the special procurement type, the system looks for existing costing data and transfers that data into the cost estimate.
    • It ignores any cost estimates for the material component that exist in the plant in which the cost estimate is being created.
    • For materials in plants that are assigned to another company code, you specify how the system should proceed in the step Activate cross-company costing:
    • If you are costing across company codes, the system transfers the costing data from the other plant.
      If you have not activated cross-company costing, the system uses a price from the material master record.

      If you have not entered a special procurement type in the material master record in the Costing view, the special procurement type in the MRP view is used.

      If you do not want to use the costing data from other plants, choose the transfer control no transfer.

Strategy Sequences for Single-Plant and Cross-Plant Transfer

The strategy sequence determines the order in which the system searches for costing data. If the system cannot select a cost estimate even after reaching the end of the strategy sequence, it explodes the BOM of the material and creates a new cost estimate.

The following cost estimates can be selected with transfer control:

  • Future standard cost estimate
  • Current standard cost estimate
  • Previous standard cost estimate
  • Period-based standard cost estimate
  • Other cost estimates

You can define up to three strategies for single-plant transfer and three strategies for cross-plant transfer.

You limit the search further by setting the following indicators:

  • Within current fiscal year

    Here the costing dates must lie within the current fiscal year.

  • Age (periods)

    Here you can specify how many periods the system should search for costing data in. If the indicator Within current fiscal year is set, the number of periods that you enter here is limited to the fiscal year.

Partial Costing for Collective Requirements Materials

If you turn on the indicator Transfer only with collective requirements material, the transfer depends on the requirements indicator of the material component.

  • For materials in the individual requirements the system creates a new cost estimate even if a cost estimate for the material exists according to the strategy sequence.
  • For materials in collective requirements, the existing cost estimates are transferred into the new cost estimate.

There are two different cases:

  • In the costing run, you create a cost estimate without exploding the quantity structure. A cost estimate can only be transferred if the secondary requirements indicator for the costed material is set to "2" (only collective requirments) in the MRP 2 view of the material master record.
  • In cost estimates with quantity structure, sales order cost estimates, and in the costing run after the BOM explosion, the secondary requirements indicator in the BOM item has a higher priority as the setting in the material master record and the secondary requirements indicator 2 (only collective requirements) is passed on to all lower-level BOM components.

Standard settings

The standard system contains the following predefined transfer control IDs:

  • PC01 Transfer with plant change

    Used for transfer from another plant and production in another plant. This prevents the quantity structure in the other plant from being exploded and recosted.

  • PC02 Complete transfer

    Mainly used for costing new products whose BOM contains materials that have already been costed.

  • PC03 Sales order KDN

    Used to improve performance in sales order costing. Only the costs for materials from the sales order stock are recalculated.

Activities

Check whether the existing transfer control IDs meet your requirements.

  1. Choose New entries.
  2. Enter an alphanumerical key and a name for the transfer control.
  3. Create a transfer control for single-plant and cross-plant transfer.

    If you want to limit the time frame in which the system looks for a cost estimate, enter the number of periods in the field Age (periods) or set the indicator Within current fiscal year.

    If you choose the transfer control Other cost estimates, you can enter a costing variant and a costing version.

    • If you do not enter a costing variant in this transfer control, the system uses the costing variant that you cost with.
    • If you do not enter a costing versions with this transfer control, the system uses the costing version that you cost with.
  4. Save the transfer control
  5. Assign the transfer control to a costing variant.

Further notes

To improve performance in sales order costing, do the following in each period:

  1. Define a costing run that includes the collective requirements materials that can be selected as material components for the sales order cost estimate. For the costing run, select a costing variance that is suitable for the standard cost estimate.
  2. With the costing run, calculate the planned costs for these materials, mark the costing results, and release them.
  3. In the costing variant for sales order costing, choose a transfer strategy that accesses the values in the current standard cost estimate.

The strategies for transfer control should match the determination of the costing lot size in the costing variant.

  • If the costing lot size for individual requirements materials is passed on, make sure that transfer only takes place for collective requirements materials.
  • If the costing lot size is always passed on, you should not define transfer control IDs for sales order costing.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUORKKOKKM 0 HLA0001439 Cost Estimate with Quantity Structure 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_CK24 V - View OKKM 01 Transfer control 
History
Last changed by/on SAP  19990413 
SAP Release Created in