SAP ABAP IMG Activity SIMG_ORKK_SERIE_KA02 (Define Cost Elements for WIP Calculation)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_ORKK_SERIE_KA02 Define Cost Elements for WIP Calculation  
Transaction Code S_ALR_87008262   IMG Activity: SIMG_ORKK_SERIE_KA02 
Created on 19981222    
Customizing Attributes SIMG_ORKK_SERIE_KA02   Define Cost Elements for WIP Calculation 
Customizing Activity SIMG_ORKK_SERIE_KA02   Define Cost Elements for WIP Calculation 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_ORKK_SERIE_KA02    

In this step you can check the cost elements under which the work in process and (if applicable) the reserves are updated on the order (product cost collector or (manufacturing order.

These secondary cost elements have cost element type 31 (results analysis for orders/projects). In the step Define Update, assign these results analysis cost elements to the individual line IDs. The value of the line ID is updated on the order under the appropriate results analysis cost element.

If you want to transfer the work in process or reserves for unrealized costs to Financial Accounting, you must define posting rules. Do not define any cost elements in the Controlling component for the G/L accounts in these posting rules, because the order is not credited when the work in process is settled.

Reports are defined in the information system that display the data from results analysis under the results analysis cost elements. Order hierarchies can be used to display this data at higher levels, such as at plant level.

Requirements

You must already have completely created a controlling area.

Standard settings

The standard system provides a number of predefined results analysis cost elements.

Further notes

  1. Check whether the cost elements provided with the standard system meet your requirements.
  2. If necessary, create new cost elements of cost element type 31 (results analysis for projects/orders).

Transports

For transporting cost elements, a special function is provided in the Implementation Guide for Controlling General.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_ORKK_SERIE_KA02 0 HLA0009425 Product Cost by Period 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
KA01 T - Individual transaction object KA02 ORKK15 Change Cost Element 
KA01 T - Individual transaction object KA03 ORKK16 Display Cost Element 
KA01 T - Individual transaction object KA06 ORKK14 Create Cost Element 
History
Last changed by/on SAP  19981222 
SAP Release Created in