SAP ABAP IMG Activity SIMG_ORKK_SEIBAN (Define Costing Variants)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_ORKK_SEIBAN Define Costing Variants  
Transaction Code S_ALR_87008153   IMG Activity: SIMG_ORKK_SEIBAN 
Created on 19981222    
Customizing Attributes SIMG_ORKK_SEIBAN   Costing Variants for Production Lot Costing 
Customizing Activity SIMG_ORKK_SEIBAN   Costing Variants for Production Lot Costing 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_ORKK_SEIBAN    

A costing variant enables you to combine all the control parameters for costing.

The costing variant connects the application to Customizing, in that all cost estimates are created and saved with reference to a costing variant.

The costing variant enables you to determine how a cost estimate is created. For example, it controls how the quantity structure or value structure is structured.

A costing variant for production lots contains the following parameters:

Note

Although it is technically possible for different costing variants to have the same costing type and valuation variant, this should be avoided to prevent data from being overwritten.

This is because the key structure for the costing results in the database is based on the costing type and the valuation variant, and not on the costing variant.

Example

Requirements

Standard settings

The costing variants in the standard system for SEIBAN cost estimates are PPC5 and PPC6.

Recommendation

Activities

Establish whether the costing variants in the standard system meet your requirements.

To create a new costing variant for production lot costing, proceed as follows:

  1. Enter an alphanumeric key and a name for the costing variant.
  2. Assign the following parameters to the costing variant:
    • Costing type
    • Valuation variant
    • Date control
    • Quantity structure determination
  3. Specify the following:
    • How system messages for the cost estimate should be issued (error management)
    • Whether the lot size of the highest assembly should be used as the basis for the cost estimate of the material components situated beneath it
  4. Specify the following:
    • Which parameters are proposed on saving the cost estimate
  5. Enter a reference variant if necessary.

Further notes

You can find additional information about SEIBAN and SEIBAN costing (production lot costing) in the SAP Library in the Production Lot Planning and Product Cost Planning sections.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_ORKK_SEIBAN 0 HLA0001439 Cost Estimate with Quantity Structure 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_CK03 V - View OKYH SEIBAN Costing Variants for Seiban 
History
Last changed by/on SAP  19990316 
SAP Release Created in