SAP ABAP IMG Activity SIMG_CFMENUORKKOSP3 (Check Control Data for Repetitive Manufacturing Profiles)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_CFMENUORKKOSP3 Check Control Data for Repetitive Manufacturing Profiles  
Transaction Code S_ALR_87008241   IMG Activity: SIMG_CFMENUORKKOSP3 
Created on 19981222    
Customizing Attributes SIMG_CFMENUORKKOSP3   Check Control Data for Repetitive Manufacturing Profiles 
Customizing Activity SIMG_CFMENUORKKOSP3   Check Control Data for Repetitive Manufacturing Profiles 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUORKKOSP3    

This step is only relevant in repetitive manufacturing environments.

In this step, you make the relevant settings for Cost Object Controlling in the Control Data 1 tab.

  • You specify whether a backflush is entered when the goods are received in inventory. This means that the goods receipt that credits the product cost collector and the goods issue that debits the product cost collector take place simultaneously. Accordingly, the goods issue is posted automatically. You can manually correct the issued quantity suggested by the system when you withdraw more or less than originally planned.
  • You specify whether reporting point confirmations are entered. Reporting point confirmations are a prerequisite for WIP and scrap variance calculations. Reporting point confirmations are not possible in make-to-order repetitive manufacturing. You can use optional reporting points if you want to calculate work in process without making confirmations for each reporting point in Logistics.
  • You specify whether the system automatically posts the goods receipt when backflushing at the last reporting point. Thereby, at the last reporting point, the quantity produced is automatically delivered to inventory and the product cost collector is credited accordingly.
  • Control of the Confirmation Procedure

    If, for example, you would like to improve performance by not posting data to Cost Object Controlling when goods receipt postings and reporting point confirmations are entered, you can separate the logistical and cost accounting update through process control.

  • You specify whether the system automatically allocates internal activites when you confirm reporting points or receive goods. You also specify which cost estimate the system uses as a basis when suggesting the consumed activity quantities. You can choose between the standard cost estimate for a material and the preliminary costing for the product cost collector. You can change the activity quantities manually if you use more or less activities than originally planned.

See the documentation under Repetitive Manufacturing for information on the other control data that has no influence on Cost Object Controlling.

Business Attributes
ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 3   Nonrequired activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUORKKOSP3 0 HLA0009425 Product Cost by Period 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T437S_GES V - View SM30 01  
History
Last changed by/on SAP  19990412 
SAP Release Created in