SAP ABAP IMG Activity SIMG_CFMENUORKKOKZ3 (Define Cost-Accounting-Relevant Default Values for Order Types and Plants)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-OBJ (Application Component) Cost Object Controlling
     KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID SIMG_CFMENUORKKOKZ3 Define Cost-Accounting-Relevant Default Values for Order Types and Plants  
Transaction Code S_ALR_87008022   IMG Activity: SIMG_CFMENUORKKOKZ3 
Created on 19981222    
Customizing Attributes SIMG_CFMENUORKKOKZ3   Define Default Values for Order Types (PP and CO) 
Customizing Activity SIMG_CFMENUORKKOKZ3   Define Default Values for Order Types (PP and CO) 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUORKKOKZ3    

Here you define default values for manufacturing orders, for production orders without quantity structure (CO production orders), and for product cost collectors for each plant and order type.

You can make new entries here for production orders without quantity structure and product cost collectors.

For production orders with quantity structure and for process orders you make new entries in the processing step Maintain Order-Type-Dependent Parameters in the implementation guide of Product Cost Planning (PP) or Product Cost Planning Process Industry (PP-PI). You can either make the settings relevant for Cost Object Controlling for manufacturing orders there or in this processing step.

You specify the following in the default values for each order type and plant:

  • Whether you want to collect the costs on a manufacturing order or on a product cost collector.

    If you want to collect the costs on a product cost collector, use the functionality of Product Cost by Period. If you collect the costs on a product cost collector, then the manufacturing order is not a cost cost object. To make the necessary settings for the product cost collector, go to Product Cost by Period in Customizing.

  • Whether you want to use the functionality of Product Cost by Period or Product Cost by Order.

    You specify your choice here in the default rule. The default rule determines whether settlement is made cumulatively after the last delivery, or in each period.

    • Settlement of orders to stock
    • For orders whose costs are settled to stock, settlement can take place either at the end of the period (settlement by period) or after final delivery (full settlement).
      Full settlement is used with lot-based Cost Object Controlling. Variance calculation is performed after final delivery (status GLFT) or technical completion (status TABG) of a manufacturing order. Before final delivery, the order balance is shown as work in process. The default rule for manufacturing orders that are settled cumulatively is PP1 (Production Material Full Settlement). For all manufacturing orders whose order type specifies default rule PP1, settlement type FUL (full) is specified in the settlement rule.
      As long as a production order without quantity structure does not have the status TABG, the balance of the order is shown as work in process.

      Periodic settlement is used with period-based Cost Object Controlling. Here the work in process and variances are reported on the basis of the quantities confirmed and delivered in the period. The default rule for manufacturing orders that are settled by period is "PP2 / Production Order (Periodic Settlement)".
      You can use the product cost collector as a cost object when analyzing costs with order-related production or process manufacturing, as product cost collectors always use periodic settlement. The default rule for product cost collectors is STR (With Strategy for Tracing Factor Determination). For all manufacturing orders assigned to a product cost collector, you must specify the default rule PP2 (Periodic Settlement) in the order type. Use the default rule STR (With Strategy for Tracing Factor Determination) for the product cost collector itself. The settlement type PER (periodic) is specified in the settlement rule for all product cost collectors.
      If you specify the default rule PP2 for production orders without quantity structure, then you can not calculate work in process for these orders.
    • Settlement with a cost object hierarchy
    • Orders (manufacturing orders and process orders) that are assigned to a cost object hierarchy must be settled in each period.
      For more information on handling orders within a cost object hierarchy, see Define Cost Object Categories for Cost Object Hierarchies.
    • Settlement in sales-order-related production
    • Valuated sales order stock:
      Orders that are assigned to a sales document item or WBS element can use full settlement or periodic settlement if you are using a valuated sales order stock.
      Nonvaluated sales order stock:
      For orders that are assigned to a sales order item or WBS element, the settlement type must be GES (full settlement) if you are using a nonvaluated sales order stock. The costs for these orders are included in results analysis of the sales order item or WBS element.
      For more information on orders with nonvaluated sales order stock, see Product Cost by Sales Order in the SAP Library.
  • The results analysis key

    The order is only included in the calculation of work in process when a results analysis key has been entered in it.

    • Full settlement valuates the work in process with the actual costs.
    • Periodic settlement valuates the work in process with the target costs.
  • Costing variant (preliminary costing)

    The costing variant (preliminary costing) determines which costing type and which valuation variant are used for preliminary costing.

    The valuation variant selected through the costing variant is displayed for informational purposes.

    For manufacturing orders, the costing sheet for overhead calculation in period-end closing and preliminary costing is proposed through the valuation variant that is assigned to the costing variant for preliminary cost estimates.

    The costing variants Plan (for preliminary costing) and Actual (for the calculation of overhead in period-end closing) for the product cost collectors are taken over from the default values of the order type.

    The costing sheet in the master data of the product cost collector is determined through the default value for the costing variant Plan belonging to the order type:

    A valuation variant has been specified in this cost variant.

    The default value for the costing sheet is calculated from this valuation variant and transferred into the master data of the product cost collector. The costing sheet transferred into the product cost collector is used for the calculation of overhead in preliminary costing and for the calculation of actual overhead.

    In case no default values exist for the costing variant Plan, the default values of the costing variant Actual are used to calculate the costing sheet. The costing sheet is transferred into the master data of the product cost collector and can be changed there.

    For production orders without quantity structure, you enter a costing variant for the preliminary cost estimate in a planning profile (instead of seperately for each order type/plant) that you directly link to the order type.

  • Costing variant (simultaneous costing)

    The costing variant (simultaneous costing) determines which costing type and which valuation variant are used for valuation.

    The valuation variant selected through the costing variant is displayed for informational purposes. For manufacturing orders and product cost collectors, the valuation variant of the simultaneous cost estimate determines what activity price is used to valuate the activity types and business processes posted to the order.

    For product cost collectors, the costing sheet for overhead calculation in period-end closing is determined through the valuation variant of simultaneous costing and entered as a default value in the master data of the product cost collector.

    For production orders without quantity structure, you cannot enter a costing variant for simultaneous costing. Activity types and business processes are valuated on the basis of the plan price of the period.

  • When preliminary costing of the manufacturing order takes place

    The following applies to the planned costs of the manufacturing order:

    • You can change the planned costs when you create the manufacturing order
    • You can change the planned costs when releasing the order
    • You can have the system calculate the planned costs at any time
    • You can do this within a manufacturing order or perform preliminary costing for multiple manufacturing orders using the report PPSFCACT.
      For performance reasons, it might be best to trigger preliminary costing manually (usually with the report).

      See also: Planned Cost Calculation

You can also set the following indicators:

  • ReqNetPrice

Requirements

If you want to define your own costing variants, valuation variants and results analysis keys, you must process the following:

Check Costing Variants for Production Orders or Check Costing Variants for CO Production Orders or Business Attributes

ASAP Roadmap ID 204   Establish Functions and Processes 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUORKKOKZ3 0 HLA0009426 Product Cost by Order 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T399X_PC V - View SM30 0000000001 Default Values for Cost Object Controlling 
History
Last changed by/on SAP  19990628 
SAP Release Created in