Hierarchy
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID | SIMG_CFMENUORKKOKKO | Define Costing Variants |
Transaction Code | S_ALR_87008183 | IMG Activity: SIMG_CFMENUORKKOKKO |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUORKKOKKO | Check Costing Variants for Base Object Costing |
Customizing Activity | SIMG_CFMENUORKKOKKO | Check Costing Variants for Base Object Costing |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUORKKOKKO |
The control parameters for base object costing are contained in costing variants.
The costing variant forms the link between the application and Customizing, since cost estimates are created and saved with reference to a costing variant.
The costing variant controls how costing is carried out. You specify the following:
- What prices are used to valuate materials, internal activities, and external activities
- Whether cost elements are assigned to the costing items
A costing variant for base object costing includes the following parameters:
- Costing type
For base object costing, the standard system provides costing type 02. The costing type for base object cost estimates controls which valuation view is costed.
- Valuation variant
Here you can define strategy sequences for the selection of a price from the material master record and an activity price in Cost Center Accounting.
Note
Although it is technically possible to have two costing variants with the same costing type and valuation variant, this should be avoided to prevent data from being overwritten.
The reason for this is that the key structure for the costing results in the database uses the costing type and the valuation variant, rather than the costing variant.
Requirements
If you want to use your own parameters you must do the following:
Define costing types
Define valuation variants
Standard settings
The standard system contains the predefined costing variant PG. This costing variant specifies costing type 02 and valuation variant 012. It enables assignment of the costing items to costing types.
SAP recommendation
You should assign a different valuation variant to each costing variant with which you intend to save cost estimates.
This one-to-one assignment enables you to change the valuation strategies later as required.
Actions
Decide whether costing variant PG provided in the standard system meets your requirements.
To create a new costing variant:
- Choose New entries.
- Enter an alphanumerical key and a name for the costing variant.
- Assign costing type 02 and a valuation variant to the costing variant.
- Specify whether cost elements are to be assigned to the costing items.
- Save your entries.
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 1 | Critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUORKKOKKO | 0 | HLA0100146 | Reference and Simulation Costing |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_CK03 | V - View | OKKO | 0000000002 | Costing Variants: Base Object Costing |
History
Last changed by/on | SAP | 20000120 |
SAP Release Created in |