SAP ABAP IMG Activity SIMG_CFMENUORKKOKIQ (Define Costing Types)
Hierarchy
ECC-DIMP (Software Component) DIMP
   CO-PC-PCP (Application Component) Product Cost Planning
     ISAUTO_CK (Package) Automotive Enhancements to PP Product Costing
IMG Activity
ID SIMG_CFMENUORKKOKIQ Define Costing Types  
Transaction Code S_KA5_12000963   (empty) 
Created on 20010223    
Customizing Attributes SIMG_CFMENUORKKOKIQ   Define Costing Types 
Customizing Activity SIMG_CFMENUORKKOKIQ   Define Costing Types 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUORKKOKIQ    

In this process step you specify the technical attributes of the concurrent costing.

You should note that the price update is not supported for concurrent costing, and neither is the partner version active in this scenario. You can only save a concurrent costing on the basis of a focus or assembly group.

If you do not want to roll up the chances and risks which you have maintained in the concurrent costing master data for this concurrent costing, you have to remove the indicator include chances and risks on the tab page other.

The costing type specifies

  • the basis on which the overhead is determined.

    Enter a cost component view for this. This view specifies what proportion of the cost components are included in the inventory valuation, the commercial inventory valuation and the tax-based inventory valuation. The system generates an itemization for each cost cost component view, listing the individual items entered in the costing.

    If, for example, semifinished products have been entered in the costing the costs of which contain costs of goods manufactured, sales and administration costs and so on, you can determine the material overhead only on the basis of the costs of goods manufactured for the semifinished product by entering the cost component view "01" (costs of goods manufactured) as the overhead base.

Requirements

If you want to define your own cost component split, carry out the step define cost components

If you want to cost parallel values, you have to do the following:

  • In Customizing General Controlling, check the settings for parallel valuation.
  • In Customizing Enterprise Controlling, check the assignment of the operative valuation from the currency and valuation profile to the controlling area:
    check settings for controlling area

Standard settings

Costing type 27, the simulation costing, has been predefined for the concurrent costing.

Further notes

You can find detailed information about the concurrent costing and the concurrent costing master data in the SAP library under the Industry Business Solution Discrete Industries.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 1   Critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUORKKOKIQ 0 P450002042 Product Variant Structure 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_CK01 V - View OKIQ 0000000099  
History
Last changed by/on SAP  20010223 
SAP Release Created in 46C