SAP ABAP IMG Activity SIMG_CFMENUORKKCKC1 (Check Settings)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
⤷ CO-PC-OBJ (Application Component) Cost Object Controlling
⤷ KK0C (Package) Customizing for Cost Object Controlling
IMG Activity
ID | SIMG_CFMENUORKKCKC1 | Check Settings |
Transaction Code | S_ALR_87008191 | IMG Activity: SIMG_CFMENUORKKCKC1 |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUORKKCKC1 | Check Settings |
Customizing Activity | SIMG_CFMENUORKKCKC1 | Check Settings |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUORKKCKC1 |
In this step you can display the settings for a costing variant and for a cost component structure to check the settings for material costing.
Example
Requirements
You have defined a costing variant.
Standard settings
Recommendation
To check which settings are linked to the costing variants in the standard system, carry out the function with these costing variants (such as PPC1).
Activities
- Enter the costing variant.
- Choose Execute.
Further notes
Business Attributes
ASAP Roadmap ID | 204 | Establish Functions and Processes |
Mandatory / Optional | 3 | Nonrequired activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUORKKCKC1 | 0 | HLA0001439 | Cost Estimate with Quantity Structure |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
IMGDUMMY | D - Dummy object | CKC1 | 1 | Check report for costing variant |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |