SAP ABAP IMG Activity SIMG_CFMENUOPP1OPVP (Carry Out Collective Availability Check)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID | SIMG_CFMENUOPP1OPVP | Carry Out Collective Availability Check |
Transaction Code | S_ALR_87006207 | IMG Activity: SIMG_CFMENUOPP1OPVP |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUOPP1OPVP | Carry Out Collective Availability Check |
Customizing Activity | SIMG_CFMENUOPP1OPVP | Carry Out Collective Availability Check |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUOPP1OPVP |
In this step, you define the list layout profile for the planned order overview and the component list in collective availability.
The profiles control which fields the system displays in the lists and how the system groups and sorts data. The order view profile controls the layout for the list of planned orders and the component view controls the layout of the component list.
You can define your own user-specific profile.
Example
Requirements
Standard settings
The following profiles have been defined in the standard settings:
- Order view profile 000001 (standard profile)
- Component view profile 000001 (standard profile)
Recommendation
If you want to create a new profile, you can copy and then change the existing profile.
Activities
To create a new profile, proceed as follows:
- Create the field selection profile and define the field selection for the profile. You can select a maximum of 11 fields.
- Define the group criteria profile and set according to which field the system is to carry out the grouping of planned orders. In the standard profile, the planning plant is defined as the grouping criteria. You can define a maximum of 2 criteria.
- Define the profile for the sort criteria and determine according to which criteria (for example, the order start date) the system is to sort the planned orders. You can enter a maximum of 4 criteria.
- Create the order view profile and assign your subprofiles to a field selection, sorting criteria and grouping criteria.
- To create a new profile for the component view, use the same procedure as above.
Further notes
Business Attributes
ASAP Roadmap ID | 261 | Define Screen Control |
Mandatory / Optional | 2 | Optional activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUOPP1OPVP | 0 | HLA0006456 | Procurement Proposal |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
OPVP | T - Individual transaction object | OPVP | 01 | Collective Availibility Check Profile |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |