SAP ABAP IMG Activity SIMG_CFMENUOPP1OMPG (Define Consumption Mode and Period of Adjustment)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID SIMG_CFMENUOPP1OMPG Define Consumption Mode and Period of Adjustment  
Transaction Code S_ALR_87006559   IMG Activity: SIMG_CFMENUOPP1OMPG 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOPP1OMPG   Define Consumption Mode and Period of Adjustment 
Customizing Activity SIMG_CFMENUOPP1OMPG   Define Consumption Mode and Period of Adjustment 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOPP1OMPG    

In this step, you define the (time) control parameters per plant and MRP group for the consuption of planned independent requirements and customer requirements/sales orders. You also define the period of adjustment.

Consumption parameters

The consumption parameters are used for all planned strategies where consumption takes place.

The plant parameters are only used if no material-specific consumption mode and/or consumption interval has been maintained.

  • Consumption mode

    The consumption mode defines the direction on the time axis in which requirements are consumed.
    If no entry has been made in the field, Consumption mode, the system will only carry out backward consumption, that is, customer requirements only consume planned independent requirements that lie before the customer requirements.

  • Consumption interval (forward/backward)
  • The consumption interval determines the interval in which a consumption should take place. The consumption intervals are maintained in calendar days.
    If no consumption interval has been maintained, the customer requirements can only consume the planned independent requirements that are planned on exactly the same day.

Period of adjustment and adjustment indicator

You use the adjustment function to define that only customer requirements are relevant for the planning run in a predefined period (that is the period of adjustment). The system creates no order proposals in the planning run for planned independent requirements that lie within the period of adjustment and for which no firmed receipts and no firmed order proposals have been planned. The period of adjustment is maintained in calendar days.

You can use the adjustment indicator to define whether the number of days are to be calculated from the current date in the past or in the future. Or, whether the period of adjustment is valid for planned independent requirements of all planning strategies or only for those in which consumption takes place.

Note

The period of adjustment is only valid if the adjustment indicator has been maintained as well.

Actions

Define the consumption mode as well as the consumption interval at plant level. If necessary, maintain the period of adjustment and the adjustment interval.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 1   Mandatory activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOPP1OMPG 0 HLA0009524 O HLA0006250  
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
V_T438M_V V - View SM30 02 Consumption 
History
Last changed by/on SAP  19981222 
SAP Release Created in