Hierarchy
⤷ PP-MRP-BD (Application Component) Master Data
⤷ MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID | SIMG_CFMENUOPP1OMDU | Activate MRP and Set Up Planning File |
Transaction Code | S_ALR_87006496 | IMG Activity: SIMG_CFMENUOPP1OMDU |
Created on | 19981222 | |
Customizing Attributes | SIMG_CFMENUOPP1OMDU | Activate MRP and Set Up Planning File |
Customizing Activity | SIMG_CFMENUOPP1OMDU | Activate MRP and Set Up Planning File |
Document
Document Class | SIMG | Hypertext: Object Class - Class to which a document belongs. |
Document Name | SIMG_CFMENUOPP1OMDU |
In the IMG activity "Activate plant", you make the settings required for carrying out the planning run:
- Activating material requirements planning
- Setting up the planning file
- Consistency check for the planning file
Activate Material Requirements Planning
You define the plants for which you want to carry out MRP here. Entries are only to be made in the planning file once this indicator has been set. This means:
- When creating a material, the material number is entered in the planning file and the system sets the total change indicator as well as the net change planning indicator
- Every time the material undergoes a change relevant to the planning run, the system sets the total change indicator and/or the net change planning indicator (depending on the planning horizon).
Set up Planning File
Here, you must carry out a background job for creating the planning file entries.
Choose "Set up planning file" if you want to activate MRP for a plant whose material master data already exists in the system. Thus, the materials are then included in the planning file.
The procedure for setting up the planning file entries is as follows:
- Create variant for your background job.
- You have two options on how to proceed:
- Using Schedule, you can define when the background job is to be started. The background job is then automatically started on the defined date (date and time).
- By choosing Show scheduling, you can display the scheduled background jobs.
- By choosing Immediate start, the job is started immediately and is carried out in the background.
Consistency Check for the Planning File
The planning file entries are checked to make sure that they are consistent by using a background job. This program deletes planning file entries that are no longer valid or adjusts them accordingly.
Carry out the consistency check, if you:
- Deactivcate material requirements planning
- Deactivate materials planning for material master records by using the MRP type "No planning"
Actions
Activating material requirements planning
- If necessary, activate MRP for plants that are relevant to planning
- Set up the planning file for the appropriate plants
Deactivating material requirements planning.
- If necessary, deactivate MRP in the appropriate plants.
- Start the background job which you use to delete the planning file entries in the planning file that are no longer relevant.
Reorganize the materials in the planning file by starting the background job that deletes the materials in the planning file that are no longer relevant to the planning run.
Business Attributes
ASAP Roadmap ID | 203 | Establish Master Data |
Mandatory / Optional | 1 | Mandatory activity |
Critical / Non-Critical | 2 | Non-critical |
Country-Dependency | A | Valid for all countries |
Assigned Application Components
Documentation Object Class | Documentation Object Name | Current line number | Application Component | Application Component Name |
---|---|---|---|---|
SIMG | SIMG_CFMENUOPP1OMDU | 0 | HLA0006451 O HLA0006250 |
Maintenance Objects
Maintenance object type | C | Customizing Object |
Assigned objects | ||||||
---|---|---|---|---|---|---|
Customizing Object | Object Type | Transaction Code | Sub-object | Do not Summarize | Skip Subset Dialog Box | Description for multiple selections |
V_001W_B | V - View | OMDU | 02 | Activate Material Requirements Planning |
History
Last changed by/on | SAP | 19981222 |
SAP Release Created in |