SAP ABAP IMG Activity SIMG_CFMENUOPP1OM0D (Define Period Profile for Safety Time/Actual Range of Coverage)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-MRP-BD (Application Component) Master Data
     MD0C (Package) Customizing R/3 Material Requirements Planning
IMG Activity
ID SIMG_CFMENUOPP1OM0D Define Period Profile for Safety Time/Actual Range of Coverage  
Transaction Code S_ALR_87001069   IMG Activity: SIMG_CFMENUOPP1OM0D 
Created on 19981222    
Customizing Attributes SIMG_CFMENUOPP1OM0D   Define Period Profile for Safety Time/Actual Range of Coverage 
Customizing Activity SIMG_CFMENUOPP1OM0D   Define Period Profile for Safety Time/Actual Range of Coverage 
Document
Document Class SIMG   Hypertext: Object Class - Class to which a document belongs.
Document Name SIMG_CFMENUOPP1OM0D    

In this IMG activity, you define the period profile for the safety time/actual range of coverage.

However, this is only necessary if you want to plan certain periods using a different actual range of coverage from the one you defined in the material master in the safety time / actual range of coverage field or you also want to take account of a DS:DE.SHDEC>safety time that is less than one day.

Example

During the christmas period, a higher actual range of coverage is to be used than in the other months. In this case, you define a period profile and define the period as well as the desired safety time (actual range of coverage).

Requirements

Standard settings

Recommendation

Activities

  1. You define the period profile.
  2. Define the period and the number of days.

    You can maintain several periods with various actual ranges of coverage for each profile. The periods, however, are not allowed to overlap.

    You can define the actual range of coverage as 0.

  3. Enter the period profile in the material master.

Further notes

In the planning run, the system checks whether a period profile has been defined and whether the requirements date falls in one of the defined periods. If yes, the system uses the actual range of coverage defined in the profile. If not, the system uses the value defined in the material master.

Business Attributes
ASAP Roadmap ID 203   Establish Master Data 
Mandatory / Optional 2   Optional activity 
Critical / Non-Critical 2   Non-critical 
Country-Dependency A   Valid for all countries 
Assigned Application Components
Documentation Object Class Documentation Object Name Current line number Application Component Application Component Name
SIMG SIMG_CFMENUOPP1OM0D 0 HLA0006804 O  
SIMG SIMG_CFMENUOPP1OM0D 1 HLA0006451 Planning Execution 
Maintenance Objects
Maintenance object type C   Customizing Object 
Assigned objects
Customizing Object Object Type Transaction Code Sub-object Do not Summarize Skip Subset Dialog Box Description for multiple selections
VC_SHPRO C - View cluster OM0D 01 View Cluster of the Period Profile for Safety Time 
History
Last changed by/on SAP  19981222 
SAP Release Created in